Stripy Sleeve
I’m about halfway done with the first sleeve, and I am done with the stripes on the sleeve! From this point to the cuff, I’ll knit in the cream color. That should make the rest of the sleeve go faster, so I hope to finish this first sleeve either today or tomorrow. I’m still on track to have this finished before the end of the month, so I should have another successful Camp Loopy summer! (On the other hand, I can’t believe that August is almost over!)
Labels: Camp Loopy 2014, Pullovers
1 Comments:
What kind of bind off did you use? I am making a Ravello now, and my bind off on the body is too tight.
Post a Comment
<< Home